**This information includes most, but possibly not all
requirements**
During your inspection the inspector will be looking
for:
- Site address marked, for locations see permit condition
|
|
- Mason County approved building plans and site plan
|
- Correct insulation R-factor installed in walls and vault & ceiling. Ceiling insulation may be inspected during final inspection.
|
- Vapor barrier installed –face staple kraft faced insulation. If paint proposed notify inspector.
|
- Water piping R-3 / Heating duct R-8 / Exhaust duct R-4
|
- **Approved site plans are required to be on-site with the approved plans at all times**
- Additional inspections may be necessary as required by the Building Official, Fire Marshal, other Mason County Department, or engineer or geologist of record.
- All construction must conform to the Mason County approved building plans and is subject to field corrections
|